process-flexibility.com

Wednesday, 12 June 2013 16:04

Pattern AP12: Remove Control Dependency

Using this pattern a control dependency and its attributes can be removed from a process schema. Similar considerations as for AP11 can be made.

Description

A control edge is removed from process schema S.

Example

Assume that for a medical treatment procedure test A has to be finished before test B may be started. In an emergency situation, however, these two tests shall be performed in parallel in order to quickly treat the patient.

Problem

An existing control dependency is not needed anymore in process schema S.

AP12

Related Patterns

Parallelize Process Fragments (AP9)
Add Control Dependency (AP11)

Animation

View Animation

Read 7147 times
 

Get the Book!

book cover small